Project on Willis Page 2
10x1spacerT.gif (810 bytes)

A pic of the bathroom after I had finished fixing the floor.  Jennifer is cleaning the bathtub in this pic.

10x1spacerT.gif (810 bytes)
awillis6.jpg (15903 bytes)
10x1spacerT.gif (810 bytes)

A pic of the half bath.  I had to do pretty much the same thing to it.

10x1spacerT.gif (810 bytes)
awillis7.jpg (17160 bytes)
10x1spacerT.gif (810 bytes)

A pic of where I had to dig up the sewer line and repair it.  Later the next year, I had dig up about 50 more feet and replace it.

10x1spacerT.gif (810 bytes)
awillis8.jpg (25849 bytes)
10x1spacerT.gif (810 bytes)

A pic of the new sewer line.

10x1spacerT.gif (810 bytes)
awillis9.jpg (25747 bytes)
10x1spacerT.gif (810 bytes)
Back to Projects