Carol, Judy's sister, and I are helping the concrete along for the foundation.
10x1spacerT.gif (810 bytes)
house1_pouring_foundation.jpg (31226 bytes)
10x1spacerT.gif (810 bytes)
Got main support beam in and getting ready to put in the floor joists.
10x1spacerT.gif (810 bytes)
house1_main_support_beam.jpg (33134 bytes)
10x1spacerT.gif (810 bytes)
Putting down the sub-flooring
10x1spacerT.gif (810 bytes)
house1_subflooring.jpg (24730 bytes)
10x1spacerT.gif (810 bytes)
Exterior walls are up and framing the inside walls now.
10x1spacerT.gif (810 bytes)
house1_framing_walls.jpg (26503 bytes)
10x1spacerT.gif (810 bytes)
John, Leon, (2 of Judy's brothers) and I are setting the trusses for the roof.
10x1spacerT.gif (810 bytes)
house1_setting_trusess.jpg (18378 bytes)
10x1spacerT.gif (810 bytes)
Dad and I are finishing up on framing the roof.
10x1spacerT.gif (810 bytes)
house1_framing_roof.jpg (30233 bytes)
10x1spacerT.gif (810 bytes)
More Construction