Milestones
Development work began 1982
First contracts for five test and 30 production aircraft signed by the Industry Group JAS and FM 1982
First engine to test 1984
First flight worthiness test 1986
First flight 1988
Production qualification 1991
Contracts for Batch 2 signed including 96 single-seat and 14 two-seat aircraft 1992
First production aircraft 1993
Swedish parliament decides to order Batch 3 including 60 aircraft 1993
Last of the 30 aircraft of Batch 1 delivered to the Swedish Defence Materiel Administration (FMV) 1996
First two aircraft in Batch 2 delivered to FMV including the first production two-seat aircraft 1996