Curriculum Vitae
H a l d a   H j   M o h a m m e d
Date of Birth: September 1975
Current Address: D - 1 - 3   Kesuma Apartments, Bandar Kinrara BK3, 47100 Puchong,
Selangor, MALAYSIA
E-mail: master_halda@yahoo.com
h/p: 6 (012) 385 7250
E d u c a t i o n
U n i v e r s i t i   T e k n o l o g i   M a l a y s i a
Gas Distribution for Engineers
Jan 2003 - June 2003
B. Sc. Industrial Engineering
Aug 1996 - Dec 1998
I n d u s t r i a l   E x p e r i e n c e
Oilfield Pipeline Inspection - Pipeline Services
- P r o j e c t  /  F i e l d   E n g i n e e r
Planning, scheduling and execution of job both in the office and on field.
Preparation of procedures, data gathering and final report completion of projects involved.
Projects Involved Includes:-
Precommissioning of 32" x 66km pipeline from B11DR-A to E11R-B
Dewatering, Swabbing, Vacuum Drying, Nitrogen Purging & Commissioning
Rejuvenation of 10" x 12.7km pipeline from West Lutong P-A to Miri Crude Oil Terminal
Cleaning, Hard De-Scaling, Gauging, Caliper Survey & MFL Inspection
Applied Industrial Engineering - Pipeline / Piping Construction
( A p r i l   2 0 0 3   -   P r e s e n t )
( N o v e m b e r   0 1  -  A p r i l  0 3 )
- P r o j e c t   E n g i n e e r
Responsible for the coordination of both on and offsite for the pipe laying activity
Preparation of procedures, authority submission (permit acquisition) and report writing for projects involved.
Projects involved includes the followings:
EPCC of NGDS for the Malaysia Design Technology Center - Cyberjaya.
180mm MDPE & Various sizes of complete internal Carbon Steel reticulation piping
EPCC of NGDS for the Precinct 16 - Putrajaya
NPS 16 x 5 km / 180mm MDPE pipeline
EPCC of NGDS for the Parcel E, Precinct 1 - Putrajaya
180mm MDPE reticulation pipeline
EPCC of NG Metering Station for SKS Power Plant - Prai
Fabrication, Installation, Hydrotest of Carbon Steel pipeworks
EPCC of NGDS for E2/E3 Government Building Parcel E, Precinct 1 - Putrajaya
Fabrication, Installation of Carbon Steel reticulation piping
EPCC of LPG reticulation system for Ampang Hospital
Installation of 20KL bulk tank system, piping works and hyrdotest of the system.
EPCC of 18" x 13km Tanjung Langsat Lateral Natural Gas Pipeline
Involvement includes the precommissioning & hot tap work of pipeline
Sobena Offshore Inc - Tubular Goods Threading
( A p r i l   2 0 0 1  -  O c t o b e r   2 0 0 1 )
- P l a n t    E n g i n e e r
Responsible for the plant machineries optimization for maximum threading production
Oversee and implement the whole plant HSE Management System
Hands on experience on CAD/CAM software for turning and milling machineries application
Professional Loss Control - Safety & Risk Engineering Consultancy
( O c t o b e r  1 9 9 9  -  M a r c h  2 0 0 1 )
- P r o j e c t  /  R i s k   E n g i n e e r
Responsible to assist the Principal Consultant on project during site visit and technical discussion with clients.
To develop the qualitative risk assessment using TRACE 8.0 software with given mitigation measures as part of the Controls of Industrial Major Accident Hazards (CIMAH)
Among the projects involved includes the followings:
Preparation of CIMAH for the Kaneka Petrochemical Complex - Gebeng.
Preparation of CIMAH for the Perbadanan Air Melaka Chlorine Facilities - Air Keroh
Preparation of CIMAH for the Petronas Centralized Utilities Facility - Kertih
Preparation of Emergency Response Procedures for Perbadanan Air Melaka Chlorine Facility