Chronology

Home Chronology Sailing List Pictures Missile Tech Training NAV Crew True Story

Emergency Deep

25 October 1966
USS GEORGE C. MARSHALL (SSBN 654) departed Charleston, S.C., for operational patrol with 16 POLARIS A-3 missiles.

USS CANOPUS (AS-34)

8 February 1973
POSEIDON conversion of USS GEORGE C. MARSHALL (SSBN 654) was completed at Puget Sound Naval Shipyard. This was the 17th SSBN to be provided with C-3 capability.

2 September 1973
USS GEORGE C. MARSHALL (SSBN 654), the 17th POSEIDON-carrying SSBN, departed for operational patrol carrying 16 POSEIDON tactical missiles. During predeployment exercises, MARSHALL launched a C-3 missile during Demonstaration and Shakedown Operations.

Refit

30 March 1977
USS GEORGE C. MARSHALL (SSBN 654) successfully launched two POSEIDON (C-3) missiles in a Follow-0n Operational Test.

2 February 1980
USS GEORGE C. MARSHALL (SSBN 654) successfully launched three POSEIDON (C-3) missiles in a Follow-0n Operational Test.

4 February 1980
USS GEORGE C. MARSHALL (SSBN 654) successfully launched one POSEIDON (C-3) missile in a Follow-0n Operational Test.

11 July 1981
USS GEORGE C. MARSHALL (SSBN 654) successfully launched four POSEIDON (C-3) missiles in a Follow-0n Operational Test.

7 April 1984
USS GEORGE C. MARSHALL (SSBN 654) completed a POSEIDON (C-3) re-fueling overhaul at Newport News Shipbuilding and Dry-dock Company, Newport News, VA. The overhaul was completed in 28.9 months.

24 July 1984
The Gold Crew of the USS GEORGE C. MARSHALL (SSBN 654) successfully launched a POSEIDON (C-3) missile in support of its Demonstration and Shakedown Operations.

Tender at Rota Spain

16 October 1987
The 60th POSEIDON Follow-on Operational Test was conducted with the successful launch of four POSEIDON (C-3) missiles by the Gold Crew of USS GEORGE C. MARSHALL (SSBN 654) .