projects
   
kunsthalle lübeck The project repairs a part of the old town of lübeck that is damaged by the war and the post-war architecture. The concept of the museum is to integrate artists’ ateliers into the circuit through the exhibition. Thus the role of the museum in the formation of art can be investigated and analysed by putting the works of the artists’ ateliers directly after their production among the pieces of the museum. 
 
competition market place of lübeck (purchase) Out of the interaction of the typical urban and constructive elements of lübeck - passage, court and corridor house a sy-stem is developped that takes into ac-count the particularity of the place, its history and its actual requirements.
   
 
Hybrid building at hackescher markt, berlin
The hybrid building with the functions library, cinemas, art gallery, swimming-bath, hotel, flats and shops is structured following the image of the „hackesche höfe“  by a network of courts. Around the large central court that frames the firewall upon the old town wall smaller courts are grouped which are characterized by their usings - atelier court, hotel court, cinema and open air theatre court and interior court of the public library.
 
tempelhof airport On the site of the former airport the city grows from the periphery to the center. Consequently an empty centre is planned that is anticipated by shortening building blocks. The periphery as the interaction zone with the existing city takes the role of the center. As an ellipse It continues the shape of the airport building erected by the na-zis as a negative space.
 
gymnasium,  berlin The dimensions of the sports field define the position of the arc framework which is constructed by two arcs follo-wing the line of the turning momentum. The skin of the roof is on one side put on top of the arc, on the other side hung below the arc
ferienxpress